2021 China New Design Central Underfloor Heating Manifold System - Brass Manifold – Xinfan
2021 China New Design Central Underfloor Heating Manifold System - Brass Manifold – Xinfan Detail:
| Warranty: | 2 Years | Model Number: | XF20160G |
| After-sale Service: | Online technical support | Type: | Floor Heating Systems |
| Product name: | Brass Manifold With Flow Meter | Keywords: | Brass Manifold With Flow Meter |
| Design Style: | Modern | Color: | Brass Raw surface |
| Brand Name: | SUNFLY | Size: | 1,1-1/4”,2-12WAYS |
| Application: | Apartment | MOQ: | 1 sets brass manifold |
| Place of Origin: | Zhejiang, China | ||
| Brass Project Solution Capability: | graphic design, 3D model design, total solution for Projects, Cross Categories | ||
Product parameters
Model:XF20160G |
Specifications |
| 1’’X2WAYS | |
| 1’’X3WAYS | |
| 1’’X4WAYS | |
| 1’’X5WAYS | |
| 1’’X6WAYS | |
| 1’’X7WAYS | |
| 1’’X8WAYS | |
| 1’’X9WAYS | |
| 1’’X10WAYS | |
| 1’’X11WAYS | |
| 1’’X12WAYS |
![]() |
A: 1’’ |
|
B: 3/4’’ |
|
|
C: 50 |
|
|
D: 250 |
|
|
E: 210 |
|
|
F: 322 |
Product material
CW603N,(Accepting other copper materials with customer-specified, such as Brass Hpb57-3,Hpb58-2,Hpb59-1,CW617N,CW603N and so on)

Processing Steps

Raw Material, Forging, Roughcast,Slinging, CNC Machining, Inspection, Leaking Test, Assembly, Warehouse, Shipping

Material Testing, Raw Material Warehouse, Put In Material, Self-Inspection, First Inspection, Circle Inspection, Forging, Annealing, Self-Inspection, First Inspection, Circle Inspection, Machining, Self-Inspection, First Inspection, Circle Inspection, Finished Inspection, Semi-Finished Warehouse, Assembling, First Inspection, Circle Inspection, 100% Seal Testing, Final Random Inspection, Finished Product Warehouse, Delivering
Applications
Hot or cold water, heating system, mix water system, Construction materials etc.

Product Description
Clear floor heating water distributor
The floor heating water distributor is generally equipped with a filter,which is specially used to prevent scale and blocking.Cleaning the floor heating water distributor is usually cleaning the filter on the water distributor.
1. Close the inlet and return water valves,and then insert the pipe used for discharging water into the outlet air valve,and open the outlet air valve to release the pressure in the heating pipe.
2. Open the nut of the filter with a wrench,take out the filter net,rinse with running water, and scrub with a waste toothbrush.
3. Check whether there is any blockage at the outlet of the filter screen,and reinstall it on the filter after washing it clean.

Product detail pictures:
Related Product Guide:
Our commission should be to provide our customers and consumers with ideal top quality and aggressive portable digital products for 2021 China New Design Central Underfloor Heating Manifold System - Brass Manifold – Xinfan , The product will supply to all over the world, such as: Irish, Liverpool, Johor, Our main objectives are to provide our customers worldwide with good quality, competitive price, satisfied delivery and excellent services. Customer satisfaction is our main goal. We welcome you to visit our showroom and office. We are looking forward to establish business relation with you.
We have been engaged in this industry for many years, we appreciate the work attitude and production capacity of the company, this is a reputable and professional manufacturer.
